Hydrometallurgy · Mineral Processing · Water Treatment

Engineering resources into sustainable value.

NEXKON is a Tashkent-based process engineering company focused on practical mineral processing, hydrometallurgy and mine-water treatment solutions—from testwork and process design to project implementation.

Core Business

Process engineering for the
resource industry.

Our work connects metallurgical fundamentals with buildable, cost-conscious plant solutions for mining and industrial projects.

01

Mineral Processing

Comminution, classification, gravity concentration and integrated beneficiation flowsheets for precious and base-metal ores.

02

Hydrometallurgy

Leaching, adsorption, solvent extraction, electrowinning and metal-recovery process development for Au, Cu and other resources.

03

Mine Water Treatment

Chemical treatment, clarification, filtration, SORBLES IH-70 iron-based adsorption and ion-removal systems for mine and industrial water.

04

Engineering & Projects

Design basis, PFD/P&ID development, equipment specification, vendor coordination, CAPEX/OPEX evaluation and project support.

About NEXKON

Engineering built around the process.

NEXKON LLC operates from Uzbekistan at the intersection of mineral resources, process technology and project execution. We focus on technically sound solutions that can be translated into equipment, piping, controls and operating procedures.

CompanyNEXKON LLC
Head OfficeTashkent, Uzbekistan
FocusMining · Hydrometallurgy · Water
Project ApproachTestwork → Design → Implementation
RegionCentral Asia & International Projects
Gold Process Development

Testwork-driven gold recovery
from ore to final product.

NEXKON develops gold process concepts from metallurgical testwork through plant engineering. A representative testwork basis demonstrates tank-agitated leaching of low-grade natural gold ore under controlled grinding, slurry-density and alkaline conditions.

0.63 g/tAu head grade
92.86%Au recovery
90% −74 µmGrinding fineness
35%Slurry solids
24 hLeach duration
01Crushing & GrindingPrepare feed to the metallurgically defined liberation target.
02Slurry ConditioningControl solids concentration and alkaline conditions before leaching.
03Agitated LeachingTank leach under optimized reagent dosage and residence time.
04Carbon RecoveryIntegrate dissolved-gold recovery with activated-carbon handling.
05Elution & EWRecover gold from loaded carbon through elution and electrowinning.
06Tailings & Water RecycleFiltration, water recycle and stable tailings management as one system.
Copper Mineral Processing & Hydrometallurgy

Integrated recovery of copper from
fine-rich oxidized ore.

NEXKON develops hydrometallurgical process concepts for oxidized copper ores by combining particle-size control, sulfuric-acid leaching, solid–liquid separation and solvent extraction. The representative Kalmakyr test program also evaluated downstream gold recovery after copper removal.

0.80–0.87%Representative Cu assay
3.93 g/LOriginal PLS Cu
>90%Fine-fraction Cu recovery
<30 kg/tAcid consumption at >90% recovery, fine group
≤1 mmRecommended particle-size range

Representative Hydrometallurgical Process Route

01Ore PreparationClassification / size reduction with emphasis on fine-rich oxidized material.
02Acid Agitation LeachH₂SO₄ leaching selected to improve kinetics where heap permeability is poor.
03Solid–Liquid SeparationSeparate Cu-bearing pregnant solution from leached solids for downstream treatment.
04PLS ConditioningControl solution chemistry and pH prior to copper solvent extraction.
05Cu Solvent ExtractionStaged SX reduces Cu in PLS while Fe remained comparatively stable in the reported tests.
06Copper RecoveryProduce a purified copper-bearing stream for the subsequent copper recovery circuit.
07Au Recovery OptionAfter Cu removal, conditioned solids can be evaluated for gold leaching as a separate stage.
Engineering Capability

From concept to controlled engineering documents.

NEXKON develops the process definition and technical documentation needed to move a project toward procurement and implementation.

Metallurgical Testwork PlanningSampling basis, laboratory test plans, interpretation and process selection.
Process Design BasisDesign criteria, feed/product envelopes, operating philosophy and design holds.
PFD & P&ID DevelopmentProcess flows, equipment tags, piping interfaces, instruments and control concepts.
Equipment EngineeringEquipment lists, datasheets, sizing basis, vendor review and package interfaces.
Techno-Economic EvaluationCAPEX/OPEX estimates, project scenarios, operating cost and cash-flow models.
Project & Site SupportProcurement support, technical queries, commissioning interface and optimization.
Mine Water Treatment · Ghana Gold Mining

Arsenic control for tailings-storage
decant water.

NEXKON develops mine-water treatment concepts for gold-mining tailings decant water, where dissolved arsenic, suspended solids and elevated conductivity can constrain compliant discharge and water reuse. A representative Ghana project basis identifies arsenic and conductivity as the primary treatment concerns.

1.0 mg/LGS1212:2019 total arsenic discharge limit cited in the project material
1,500 µS/cmConductivity limit cited for mining effluent
50 mg/LTSS limit cited for mining effluent
4.61 mg/LHighest representative monthly influent As shown in the 2017 dataset
01Tailings Decant IntakeDefine flow, water chemistry, suspended solids and seasonal variability from the TSF.
02Oxidation & ConditioningCondition arsenic-bearing water for downstream removal according to arsenic speciation and site chemistry.
03Precipitation & ClarificationRemove bulk metals and suspended solids while reducing the load on polishing treatment.
04Arsenic PolishingApply NEXKON-supplied SORBLES IH-70 iron hydroxide oxide media as the polishing step, subject to project-specific treatability and breakthrough testing.
05Ion Control & DischargeAddress conductivity where required, verify final water quality and manage treated-water reuse or discharge.

Representative Ghana Water Challenge

The project material describes gold-plant tailings generated after ore processing and stored in a tailings storage dam. Sulfide-bearing minerals, including arsenic-bearing phases, create a need for treatment before discharge.

  • Primary parameters of concern: arsenic and conductivity.
  • Representative influent arsenic shown in 2017 increases from approximately 1.55 to 4.61 mg/L over the plotted operating period.
  • Representative conductivity data include influent values up to approximately 2,791 µS/cm, above the cited 1,500 µS/cm limit.
  • The project objective is an effective, cost-conscious treatment route suitable for mining operations.

Compliance & Project Development Basis

The source material cites Ghana Standard GS1212:2019 for mining-effluent discharge and lists total arsenic at 1.0 mg/L and conductivity at 1,500 µS/cm, together with TSS 50 mg/L, COD 250 mg/L and NH₃-N 1 mg/L.

  • Bench-scale testing establishes treatability and reagent/media demand.
  • Pilot testing verifies performance under representative mine-water conditions.
  • Engineering then progresses through process definition, P&ID, equipment selection, installation and commissioning.
  • RO is identified in the project material as a commonly accepted option in Ghana, while concentrate/brine handling remains an important constraint.
NEXKON SUPPLIED ADSORBENT

SORBLES IH-70 · Iron Hydroxide Oxide Adsorbent

NEXKON supplies an iron-based solid adsorbent for mine-water decontamination and arsenic-polishing service. The supplied SDS identifies the product as SORBLES (Mixture of Iron Hydroxide), Product No. IH-70, with iron hydroxide oxide content of at least 70% and molecular formula FeO(OH). It is a pale-brown to brown, odorless solid intended for decontamination service.

≥ 70%Iron hydroxide oxide content
FeO(OH)Principal chemical formula
4.1 g/cm³Specific gravity stated in SDS
Non-hazardousNot classified as hazardous under OSHA HCS 2012 in the supplied SDS

For the Ghana tailings-decant-water concept, IH-70 is positioned as the iron-based polishing medium after bulk solids/metals removal. Final adsorption capacity, media life, bed configuration and breakthrough criteria must be established by project-specific bench/pilot testing; these performance values are not specified in the supplied SDS. Spent media must be characterized and disposed of in accordance with applicable local requirements.

Engineering note. The Ghana values above are representative project data and cited discharge criteria from the supplied project presentation. Final design must be based on current regulatory confirmation, site-specific flow and full water analysis, arsenic speciation, competing ions, sludge/residuals management and bench/pilot verification. Conductivity control is a separate design problem from arsenic removal and may require a dedicated ion-removal step.
Selected Experience

Applied engineering across
metals and mine water.

Representative areas of current NEXKON engineering activity.

PRECIOUS METALS

Gold CIL Process Development

Testwork-led crushing, grinding, tank leaching/CIL, carbon handling, elution, electrowinning, filtration, water recycle and product-recovery engineering.

BASE METALS

Copper Hydrometallurgy

Heap/tank leach process concepts integrated with solution purification and electrowinning for oxide resources.

ENVIRONMENTAL

Mine Water Treatment

Gold-mine tailings decant-water treatment combining conditioning, precipitation, clarification, filtration, arsenic polishing and ion-control strategies for compliant discharge and reuse.

Contact

Discuss your next process challenge.

For project development, metallurgical testwork, process engineering or technical collaboration, contact NEXKON in Tashkent.

NEXKON LLC

General DirectorYoung Jeong
Emailinfo@nexkon.uz
Telephone+998 90 045 67 16
Webwww.nexkon.uz
OfficeYakkasaray district, Tafakkur str. 9B
Tashkent, 100060, Uzbekistan